WCTV | Tallahassee, Thomasville, Valdosta | News, Weather, Sports

Road Closure Water & Sewer Main Installation In Valdosta

By: City of Valdosta Email
By: City of Valdosta Email

Press Release: City of Valdosta

On Monday, August 5, the City of Valdosta will begin installation of a water and sewer main along Baytree Road as part of the Island 56 Water and Sewer Extension project.

The work requires the closure of Baytree Road, between Ellis Drive and Springhill Drive, beginning at 8 a.m., with normal traffic resuming at the end of each work day. The project is scheduled to be completed by Wednesday, August 7, weather permitting.

During the construction, eastbound and westbound traffic in this particular portion of Baytree Road will be detoured along neighboring streets. Motorists are urged to drive with caution through this area for their safety and the safety of workers.

For additional information, contact the Engineering Department at (229) 259-3530.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
WCTV 1801 Halstead Blvd. Tallahassee, FL 32309
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 217978161 - wctv.tv/a?a=217978161