WCTV | Tallahassee, Thomasville, Valdosta | News, Weather, Sports

Valdosta Installs New Stormwater Pipes, Curb, Gutter, Sidewalks On River Street

By: City of Valdosta News Release Email
By: City of Valdosta News Release Email

News Release: City of Valdosta

On Monday, Feb. 10, the City of Valdosta will begin installing stormwater pipes on River Street in preparation for a new sidewalk project, which will extend from Hightower to Beck Streets. The pipes will be installed on the north side of the street.

This project is expected to be completed by the end of March, weather permitting. Due to the nature of the work, lane closures will be necessary at various times of the project. Motorists will be alerted of these lane closures with adequate traffic signage and will be safely directed around the construction areas. Citizens should find alternate routes, if possible; or drive cautiously when traveling through this area.

The stormwater pipe installation and sidewalk project are funded with SPLOST VI revenue.

Contact the Engineering Department at (229) 259-3530 for additional information.


Comments are posted from viewers like you and do not always reflect the views of this station.
powered by Disqus
WCTV 1801 Halstead Blvd. Tallahassee, FL 32309
Gray Television, Inc. - Copyright © 2002-2014 - Designed by Gray Digital Media - Powered by Clickability 243506751 - wctv.tv/a?a=243506751