At approximately 1 a.m. on Aug. 16, 2012, the pumps in the Influent Pump Station of the Withlacoochee Water Pollution Control Plant (WPCP) stopped working. An emergency bypass pump system was placed into service at 12:45 a.m., on Aug. 17; and as a result, the sewer spills are no longer occurring.